cSTART
- Contact:
R. Ruprecht
- Funding:
BMBF, KIT
- Partner:
KIT [C]
- Startdate:
2019/05
- Enddate:
2026
- 2026: Assembly of storage ring planned.
- 2023: Technical design report (TDR) of the storage ring started - Link.
- 2023/10: Electron beam after upgrade of injector and modulator.
- 2023: Photographs of the new RF photoinjector (left) and 10 MW RF unit (right) installed at FLUTE.
- 2021/01: Ordering modulator incl. klystron for linear accelerator system.
- 2020/10: Ordering modulator incl. klystron for photo-injector system.
- 2020/08: Ordering S-band radio-frequancy (RF) photo-injector system.